
================================================================================
CONNECTION ANALYSIS
================================================================================
Total connections available: 10
Connections used during conversion: 6
Unused connections: 4
Connection usage ratio: 60.00%

USED CONNECTIONS (in organized order):
--------------------------------------------------
   1. Gen1/A -> Bus2/A
   2. Gen1/B -> Bus2/B
   3. Gen1/C -> Bus2/C
   4. Load1/A -> Bus1/a
   5. Load1/B -> Bus1/b
   6. Load1/C -> Bus1/c

USED CONNECTIONS (compact grouped format):
--------------------------------------------------
  Gen1: A -> Bus2/A, B -> Bus2/B, C -> Bus2/C
  Load1: A -> Bus1/a, B -> Bus1/b, C -> Bus1/c

UNUSED CONNECTIONS (probably wrong):
--------------------------------------------------
   1. PI_Section_Line1/A -> Bus2/a
   2. PI_Section_Line1/B -> Bus1/b
   3. PI_Section_Line1/B -> Bus2/b
   4. PI_Section_Line1/C -> Bus1/c
================================================================================
