A Multi-objective Memetic Approach for Time-dependent Agile Earth Observation Satellite Scheduling Problem

Published: 01 Jan 2021, Last Modified: 20 May 2025Comput. Ind. Eng. 2021EveryoneRevisionsBibTeXCC BY-SA 4.0
Abstract: Highlights•A time-dependent bi-objective AEOSSP under the multi-orbit scenario is studied.•The proposal of a MOMA-based framework considering time-dependent transition time.•Specific crossovers and a time-dependent local search operator are designed.•MOMA-TDs show better performance against standard MOEAs.
Loading