Fleet Scheduling in Underground Mines Using Constraint ProgrammingOpen Website

2018 (modified: 03 Nov 2022)CPAIOR 2018Readers: Everyone
Abstract: The profitability of an underground mine is greatly affected by the scheduling of the mobile production fleet. Today, most mine operations are scheduled manually, which is a tedious and error-prone activity. In this contribution, we present and formalize the underground mine scheduling problem, and propose a CP-based model for solving it. The model is evaluated on instances generated from real data. The results are promising and show a potential for further extensions.
0 Replies

Loading