An effective two-stage iterated greedy algorithm for distributed flowshop group scheduling problem with setup time

Published: 2023, Last Modified: 01 Aug 2025Expert Syst. Appl. 2023EveryoneRevisionsBibTeXCC BY-SA 4.0
Abstract: Highlights•A mixed-integer linear programming (MILP) model of DFGSP is proposed.•Two rapid evaluations are designed to accelerate the calculation of the objective.•A two-stage iterated greedy algorithm is designed for solving DFGSP.•The cross-factory and inner-factory cooperative strategies are proposed.
Loading