Deterministic electric power infrastructure planning: Mixed-integer programming model and nested decomposition algorithm

Published: 2018, Last Modified: 14 May 2025Eur. J. Oper. Res. 2018EveryoneRevisionsBibTeXCC BY-SA 4.0
Abstract: Highlights•Mixed-integer model optimizes generation investment and hourly operation decisions.•Aggregation and time sampling for reducing dimension of spatial and temporal scales.•Extension Nested Benders Decomposition for large instances of multi-period model.•Model and solution method used in Texas case study with large computational savings.
Loading