A comprehensive modeling framework for hazmat network design, hazmat response team location, and equity of risk
Abstract: Highlights•We consider joint decision on network design and hazmat response team locations.•We define a new risk measure with the average response time to hazmat incidents.•We propose a robust solution method for the uncertain nature of hazmat incidents.
Loading