Joint optimization of train platforming and shunting with service scheduling at a railway hub

Published: 01 Jan 2024, Last Modified: 13 May 2025Comput. Ind. Eng. 2024EveryoneRevisionsBibTeXCC BY-SA 4.0
Abstract: Highlights•Train parking, servicing and routing at maintenance depots is jointly studied.•Multiple services are considered with a flexible storage and relocation strategy.•A novel two-layer time–space network is constructed to describe the states of the EMUs.•A heuristic algorithm based on ADMM is designed.•A small virtual and large real-world case study demonstrate the effectiveness of the approach.
Loading