Practical algorithms for weakly flexible job scheduling for smart mold component process

Published: 01 Jan 2024, Last Modified: 21 May 2025Future Gener. Comput. Syst. 2024EveryoneRevisionsBibTeXCC BY-SA 4.0
Abstract: Highlights•This paper proposes a novel scheduling algorithm for a smart manufacturing factory.•We formulate a new scheduling problem, named Weakly Flexible Job-shop Scheduling.•We propose three scheduling algorithms specially designed for targeting WFJSP.•We demonstrate the efficiency of our algorithms via real-world manufacturing data.
Loading