Abstract: Highlights•Multi-mode resource-constrained projects under mode change disruption is considered.•Makespan and several stability measures are considered.•Multi-Objective Evolutionary algorithm and innovative heuristic are proposed.•Both total rescheduling and schedule repair are investigated.
Loading