A parallel machine lot-sizing and scheduling problem with a secondary resource and cumulative demandOpen Website

2018 (modified: 28 Oct 2022)Int. J. Prod. Res. 2018Readers: Everyone
Abstract: We investigate a parallel machine multi-item lot-sizing and scheduling problem with a secondary resource, in which demands are given for the entire planning horizon rather than for every single per...
0 Replies

Loading