Approximating Weighted Completion Time for Order Scheduling with Setup Times

Published: 01 Jan 2020, Last Modified: 15 May 2025SOFSEM 2020EveryoneRevisionsBibTeXCC BY-SA 4.0
Abstract: Consider a scheduling problem in which jobs need to be processed on a single machine. Each job has a weight and is composed of several operations belonging to different families. The machine needs to perform a setup between the processing of operations of different families. A job is completed when its latest operation completes and the goal is to minimize the total weighted completion time of all jobs.
Loading