No-wait two stage hybrid flow shop scheduling with genetic and adaptive imperialist competitive algorithmsOpen Website

Published: 2013, Last Modified: 24 Oct 2023J. Exp. Theor. Artif. Intell. 2013Readers: Everyone
Abstract: This article studies a no-wait two-stage flexible flow shop scheduling problem with setup times aiming to minimize the total completion time. The problem is solved using an adaptive imperialist com...
0 Replies

Loading