Abstract: The “timeline-based” is a particular paradigm of temporal
planning that has been successfully applied in many real-world scenar-
ios. Different timeline-based planning systems have been developed, each
using its own planning specification language and solving techniques.
An analysis of the differences between such kind systems has not been
addressed yet. In previous work we have developed Epsl a planning
tool successfully applied in real-world manufacturing scenarios. During
subsequent projects our tool achieved a level of stability and a relative
maturity. In this paper we start addressing the problem of compari-
son with other timeline-based planners and presents an analysis that
concerns the Europa2 framework which can be considered the de-facto
standard for timeline-based planning. In the present work we analyze the
modeling and solving capabilities of the two frameworks. This phase of
our study identifies differences and discusses strengths and weaknesses
when solving the same problem.
Loading